10/19/12 – Paving for Shelton Road – 7 Day Look Ahead
At this time, below is the anticipated 7 day look ahead for paving work on Shelton Road. Dates are subject to change based on numerous unforeseen factors. However, the Town of Trumbull shall provide an update on a weekly basis.
Shelton Road: (from Shelton Line to approximately Cemetery Drive)
Week of October 22, 2012 – Roadway repaving to continue on Shelton Road between North Street and the Shelton/Trumbull Town line. The work for this week will include drainage improvements, excavating and grading to prepare this section of the road for asphalt installation. The roadway will be closed to passing vehicular traffic. Please follow the detour signs and police personnel. All bus stops for students on Shelton Road will remain in its current location.
Paving reconstruction project will continue into throughout October and November.